✓ Completed
2014
Conceptual design
✓ Completed
2024 to 2025
Detailed design
Summer / Fall 2026
Construction
Upgrades to support ongoing operation and improve system reliability.
Location
Fort Erie
Status
Active construction
Timeline
2014 - Summer / Fall 2026
Shirley Road Sewage Pumping Station is located at 120 Shirley Rd. in Fort Erie. The sewage pumping station was constructed in the 1990s. The catchment area for Shirley Road Sewage Pumping Station is primarily residential.
The station needs repair and sustainability upgrades.
Upgrades will be made to the:
Jasson Villeneuve
Project Manager
Niagara Region
905-980-6000 ext. 3291
Email Jasson Villeneuve
Mark Bélanger, C.E.T., P.Eng.
Division Manager, Infrastructure
Associated Engineering (Ont.) Ltd.
905-346-0990