Portage Trunk Sewer Rehabilitation
Improvements and repairs to improve sewer conditions.
Location
Niagara Falls
Status
Planning and design
Timeline
June 2024 - Summer 2028
Project overview
Niagara Region has started the preliminary and detailed design for improvements to the Portage Trunk Sewer in Niagara Falls. The sewer is in poor condition and needs repair.
The sewer is located along a hydro corridor between the rear yards of Sheldon Street and Darcy Crescent / Maplewood Avenue. Sewage from the Kalar Road Sewage Pumping Station flows into the trunk sewer at an access point. This access point is south of the rear fence line at 6606 Sheldon Ave. The sewer continues east for about 1.3 kilometres before discharging to the Stamford Interceptor. It then finally reaches the Niagara Falls Wastewater Treatment Plant.