Niagara Region is proposing a new elevated tank with a larger storage volume along with higher elevation to the meet Ministry of Environment, Conservation and Parks guidelines for storage required for day-to-day activities, fire storage, and emergency storage.
The existing tank was built in the 1980's - making it about 40 years old. The lifespan of an elevated tank depends on different factors, but this type of tank typically has a lifespan of 50 to 80 years. The existing tank is nearing the end of its expected service life.
There are a number of reasons for replacement:
- Storage capacity
- The existing tank doesn't have enough storage capacity to meet the Ministry of Environment, Conservation and Parks Design guidelines for current and future storage requirements.
- As our population grows over the next twenty years, our current water storage volume will become increasingly insufficient.
- Water pressure
- A new elevated tank would be able to provide enough water pressure to areas that currently don't meet Ministry of Environment, Conservation and Parks standard requirements. This will help with the water pressure for northern Fonthill areas that are at a higher elevation.
- Increased costs
- We've increased pumping from the Shoalts Drive Reservoir to manage the current storage shortfall of the tank. Using additional pumping to compensate has higher operational costs and isn't a sustainable option to meet the community's long-term needs.
- If the tank isn't replaced, water supply operation costs will continue to increase as the existing tank will require more maintenance as it ages. The whole system will rely on pumping, which is not ideal operationally and would result in more energy usage.
We can't expand the tank because it's difficult to enlarge a welded steel elevated tank and there's limited available space at the current location.
The Shoalts Drive Reservoir, which also provides storage to the system, does have space on site for a new reservoir cell. However, a new elevated tank is recommended because it addresses the lack of adequate pressures in some parts of the system. If we added a new reservoir cell, we would still need to upgrade the pumps at Shoalts Drive pumping station. In the long term, this option would cost more than a new elevated tank.
The new tank will have a larger storage volume and higher elevation to the meet Ministry of Environment, Conservation and Parks guidelines.