Jordan Valley Sewage Pumping Station Upgrades

To replace key equipment to improve performance and maintenance access.

A location indicator for a map

Location

Lincoln

A shovel

Status

Active construction

A calendar

Timeline

2025 - December 2026

Project overview

The Jordan Valley Sewage Pumping Station was built in 1976 and updated in 2015. It is located at 3850 Twenty-First St. in Lincoln.

Based on the 2021 Master Servicing Plan, this station does not need a capacity upgrade. However, it is not meeting its approved rated capacity of 40 litres per second, so the pumps need to be replaced.

Work includes:

  • Replacing pumps and process piping
  • Replacing the pump electrical system
  • Improving equipment serviceability for maintenance