Erie Road Sewage Pumping Station

To upgrade the Erie Road Sewage Pumping Station.

A location indicator for a map

Location

Fort Erie

Pencil on paper

Status

Planning and design

A calendar

Timeline

Fall 2022 - 2031

Project overview

The Erie Road Pumping Station at 4474 Erie Rd. in Fort Erie was constructed in 1989. The station has had growing maintenance requirements. It needs sustainability upgrades to continue servicing the catchment area.

Upgrades will be made to the:

  • Pumps
  • Meters
  • Valves
  • Electrical
  • Heating, ventilation and air conditioning
  • Generator