The Seventh Street Louth (Regional Road 34) Bridge was originally constructed in 1977. It's located on Seventh Street Louth in St. Catharines, about 150 metres north of Fourth Avenue (Regional Road 77). This bridge crosses over a CN railway.
Niagara Region will be rehabilitating this bridge in 2025 and 2026.
Project timeline
September 2025 - Completed
Start construction
Spring 2026
Finish construction
Contact
Brittany Lauzon, P.Eng.
Project Manager
Niagara Region
905-980-6000 ext. 3354
Email Brittany Lauzon
Jim Thomas, P.Eng.
Bridge Engineer, Project Manager
Associated Engineering (Ont.) Ltd.
226-214-3187
thomasj@ae.ca
Local Infomation
Expect single-lane closures and delays throughout construction.
There may also be short-duration (half-day) full road closures at certain points throughout the project. Timing will depend on construction progress. The public will be given as much notice as possible.