Sun Retreats Sherkston Shores - Complex Hot Tub Inspection Results
-
Address
490 Empire Rd,
Port Colborne -
Services
Outdoor - Whirlpool / Spa
Inspection Results - Posted for two years
Sep. 10, 2025
Routine Inspection
Corrected During Inspection
Spa hydro-massage jet fittings are equipped with a timing device that controls the period of operation of the jet pump and can be set to a maximum of 15 minutes.
Spa hydro-massage jet fittings are equipped with a timing device that controls the period of operation of the jet pump and can be set to a maximum of 15 minutes.
Corrected During Inspection
Total alkalinity is maintained at a range of 60-180 ppm.
Total alkalinity is maintained at a range of 60-180 ppm.
Not in Compliance
Manual spa tests and records completed
Manual spa tests and records completed
Jun. 6, 2025
Re-inspection
Corrected During Inspection
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Jun. 5, 2025
Routine Inspection
Not in Compliance
ORP is maintained at a range of 600-900 mV when an automatic sensing device is used.
ORP is maintained at a range of 600-900 mV when an automatic sensing device is used.
Corrected During Inspection
A clock is installed in a conspicuous location that can be viewed from anywhere in the public spa
A clock is installed in a conspicuous location that can be viewed from anywhere in the public spa
Corrected During Inspection
First-aid kit is provided in a convenient location
First-aid kit is provided in a convenient location
Not in Compliance
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Aug. 9, 2024
Routine Inspection
Not in Compliance
Manual spa tests and records completed
Manual spa tests and records completed
Corrected During Inspection
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Corrected During Inspection
pH is maintained at a range of 7.2-7.8
pH is maintained at a range of 7.2-7.8