Regional Road 20 Reconstruction
All Niagara Region projects
About the project
The remaining two phases of this project will be completed as part of a Municipal Class Schedule "C" Environmental Assessment, which identified the need for improvement in traffic operations, capacity and safety, all of which will be addressed as part of this project.
The budget for Phase 4 construction of West Street (Regional Road 20) from South Grimsby Road 5 to Wade Road (including Wade Road from West Street to its southern limit) was approved in 2024.
- Phase 5: St Catharines Street (Regional Road 20) from Canborough Street (Regional Road 14) to Industrial Park Drive
Phase 5 will see the construction of curb bump-out parking in key areas, upgraded illumination and the revitalization of the storm sewer with full resurfacing.
- Phase 4: West Street (Regional Road 20) from South Grimsby Road 5 to Wade Road
Phase 4 will see the reconstruction of Regional Road 20 to a full urban cross section, with new storm sewers, upgraded sidewalks and illumination. Watermain and sanitary sewer works will be completed on behalf of West Lincoln.
- Phase 1, 2 and 3: Complete
The three phases of this project are now complete.
The project was completed as part of a Municipal Class Schedule "C" Environmental Assessment, which identified the need for improvement in traffic operations, capacity and safety, all of which have been addressed as part of this project.
Niagara Region, in partnership with West Lincoln, worked on the following elements for this project:
Phase 1, 2 and 3
- Construction of the Smithville Square Parkette and parking lot
- This involved the conversion of an existing parking lot into a public green space which was still able to accommodate ample parking
- Reconstruct the intersection of West Street (Regional Road 20) and Station Street (Regional Road 14) into a signalized intersection
- This involved the conversion of the two-way stop into a signalized intersection, including new sidewalks and upgraded decorative signal poles
- Construction of the Station Street Parkette, upgraded sidewalks and decorative illumination, milling and paving of the road surface of West Street (Regional Road 20) between Station Street and the newly construction multi-use arena
- Reconstruct the intersection of St Catharines Street ( Regional Road 20) and Townline Road into a single-land roundabout, including storm drainage, sidewalks, bike lanes and illumination
- Reconstruct the intersection of West Street (Regional Road 20) and South Grimsby Road 6 into a single-lane roundabout, including storming drainage, sidewalks, bike lanes and illumination
This project was completed the second week of October, approximately three weeks ahead of the completion date (Oct. 31), and came in approximately $300,000 under tender bid price at completion.
The success of this project could not have been achieved without the cooperative attitude of the entire project team: Rankin Construction (contractor), Associated Engineering (consultant), Township of West Lincoln and Regional staff.
- Construction of the Smithville Square Parkette and parking lot
Project timeline
october 2019 - phases 1, 2 and 3
Construction of Smithville Square Parkette
november 2019 - phases 2 and 3
Utility relocates
april 2020 - phases 2 and 3
Construction of the roundabout at St Catharines Street (Regional Road 20) and Townline Road
Reconstruction of the intersection of Station Street at West Street (Regional Road 20) including installation of traffic signals, replacement of storm sewers and watermains
Construction of Station Street Parkette
Milling and paving of West Street (Regional Road 20) between Station Street and the multi-use recreational site, including upgraded illumination, cycling facilities and sidewalks
july 2020 - phases 2 and 3
Construction of the roundabout at West Street (Regional Road 20) and South Grimsby Road 6
Reconstruction of West Street (Regional Road 20) from South Grimsby Road 6 to South Grimsby Road 5 including the addition of street lighting, cycling facilities and sidewalks
october 2020 - phases 2 and 3
Roundabout and road reconstruction
Spring 2025 - phase 4
Issue tender and hold pre-construction Public Information Centre
Summer 2025 - phase 4
Start construction
Summer 2026 - phase 4
Finish construction
TO BE DETERMINED - phase 5
Issue tender for construction
for St Catharines Street (Regional Road 20) from Canborough Street (Regional Road 14) to Industrial Park Drive (pending budget approval)
Contact
Stephanie Huppunen, C.E.T.
Manager, Capital Projects, Transportation Engineering
Niagara Region
Email Stephanie Huppunen
Local Information
Businesses remain open
Temporary lane, sidewalk and driveway closures may happen from time to time, but access to businesses will be maintained at all times.
Expected traffic delays
Regional traffic will be kept open to through traffic during construction. However, throughout construction there will be temporary lane restrictions which will result in delays. Drivers can avoid delays by using alternative routes.