Laurie Avenue Sewage Pumping Station and Forcemain Upgrades
All Niagara Region projects
About the project
The Laurie Avenue Sewage Pumping Station is owned and run by Niagara Region and is located at 3391 Laurie Ave. in Lincoln. It services an area of approximately 103 hectares for nearby residents and businesses.
The station was constructed in 1979. It had minor upgrades in 2012 to the electrical, instrumentation and communication systems. The key mechanical components have been in service for over 40 years and are past their service life. This station needs a capacity upgrade to support the Prudhommes Landing development.
Construction will include a new 520 metre long forcemain. This will run from the pumping station, along Laurie Avenue and Victoria Avenue North, up to North Service Road.
The scope of work includes:
- Demolishing the existing building and installing a new covered shelter
- Underground infrastructure replacement
- Pump and process piping and equipment replacement
- A new outdoor natural gas generator
- Electrical, instrumentation and communication upgrades
- Site work improvements
- 520 metres of new forcemain
- Culvert relining at Laurie Avenue Bridge
Project update
The new sewage pumping station and new sanitary forcemain are in operation. Remaining work includes the final topcoat of asphalt along the new forcemain and installing a new generator at the station.
The construction schedule is being coordinated with the Town of Lincoln as they finish the Prudhommes Watermain Upgrade Project.
Project updates will be shared with stakeholders and the public online and by mail.
Construction information
-
Construction duration
Construction began in spring 2025 and the new infrastructure was placed into operation at the end of 2025. Some remaining work at the station will be completed in February 2026. The final topcoat of asphalt will be installed in spring 2026 when warmer temperatures allow.
Asphalt paving is expected to cause some traffic impacts. The public should follow traffic control directions.
-
Service interruptions to water, wastewater or power and gas supply
If service interruptions are needed, we will notify affected properties at least 48 hours before any planned interruptions.
-
Access to homes or businesses during construction
There will be access to homes and businesses along the roadway. At times, construction may block driveways for a short period. Residents will be notified of this in advance and accommodations can be arranged as needed. If you have any concerns about not having access during construction, contact the project team.
-
Walking through the construction site
The public can walk through the construction area but it's recommended to reduce any non-essential activities in the construction area. Use extra caution when entering the area, read and obey all warning signs, avoid heavy equipment and stay visible to all workers and vehicles.
-
Garbage and recycling collection during construction
There will be no changes to garbage, recycling and organics collection during construction. If needed, the contractor will carry bins to a more accessible location and return once emptied. Residents should label their bins to ensure they are not misplaced.
-
Access to Victoria Shores Park on Laurie Avenue
Access to the park will remain open throughout most of the construction, although there may be limited access for a short duration.
Project timeline
2018 to 2023 - Completed
Detailed design
2018 - Completed
Subsurface utility engineering investigation
2019 - Completed
Geotechnical investigation
February to July 2024 - completed
Request for tender
2025 to 2026 - in progress
Construction
Contact
Dana Knegt, C.Tech
Niagara Region
Project Manager
289-929-8451
Email Dana Knegt
Tyler Young
R.V. Anderson Associates Ltd.
Assistant Contract Administrator
905-685-5049 ext. 4216
tyoung@rvanderson.com
Niagara Region Dispatch
905-984-3690
Local Impacts
Wastewater services
Wastewater collection services to remain operational throughout construction.
Traffic
During forcemain construction, access to some driveways may be limited for a short time. On-site staff will provide notice and arrange accommodations ahead of time. Traffic may be affected by lane closures, but efforts will be made to reduce their frequency and duration. Alternate routes around the construction area will be posted.
Inspections
Inspection notices from OZA Inspection Ltd. were sent to properties in the project area for pre- and post-construction records. Niagara Region recommends that residents allow OZA Inspections staff access to their property for this survey.