Welland Water Treatment Plant - 2016 Summary Report

Prepared under Ontario Regulation 107/03

The Welland Water Treatment Plant was operated in such a way that at no time did it fail to meet or exceed the requirements of the Act, the regulation, the system’s approval or any order that may have been issued for this reporting period.

Summary of Flows

Date Total Flow Raw (ML) Total Flow Treated (ML) Average Day Raw (ML) Average Day Treated (ML) Maximum Day Treated (ML) Minimum Day Treated (ML) Maximum Flow Rate Treated (ML/d) Minimum Flow Rate Treated (ML/d) Waste Sludge (ML)
January 630.160 572.960 20.328 18.483 23.120 14.600 32.227 12.355 22.700
February 585.780 535.020 20.199 18.449 21.320 15.950 36.979 18.144 23.506
March 617.000 557.700 19.903 17.990 20.850 14.930 35.942 17.364 33.090
April 603.090 546.590 20.103 18.220 19.980 15.880 34.301 8.726 29.347
May 698.620 633.520 22.536 20.436 27.750 16.620 65.578 10.672 26.630
June 806.590 726.880 26.886 24.229 30.730 17.960 38.362 19.354 33.210
July 885.120 806.720 28.552 26.023 30.940 21.230 53.832 17.727 30.597
August 855.510 782.550 27.597 25.244 33.410 20.520 53.136 8.407 31.916
September 789.860 710.870 26.329 23.696 28.980 18.520 61.258 17.280 31.010
October 756.350 702.766 24.398 22.796 26.805 17.513 51.674 17.712 44.888
November 722.050 694.035 24.068 23.135 29.685 19.814 47.088 21.660 53.752
December 741.410 731.367 23.916 23.592 25.457 20.247 47.000 4.392 0.000
Total 8691.540 8000.978 360.646
Minimum 14.600 4.392 0.000
Maximum 33.410 65.578 360.646
Average 23.735 21.858 30.054

The flow rates are moments in time, and can be affected by various circumstances, such as pump changes or valve position and therefore not unusual to have higher or lower than normal flows.

Comparison of Actual to System Approved Flow

Flow rates as set in the Municipal Drinking Water Licence # 007-104 and Drinking Water Works Permit # 007-204.

Maximum daily flow: 65.000 ML
Maximum flow rate: 65.000 ML/day
Maximum daily flow - during construction 81.800 ML
Maximum flow rate - during construction 81.800 ML/day

The percentage of rated capacity has been calculated based on the maximum daily flow during construction for January 1, 2016 – December 31, 2016

Date Average Day Treated (ML) % of Rated Capacity Maximum Day Treated (ML) % of Rated Capacity Maximum Flow Rate Treated (ML/d) % of Rated Capacity
January 18.483 22.59% 23.120 28.26% 32.227 39.40%
February 18.449 22.55% 21.320 26.06% 36.979 45.21%
March 17.990 21.99% 20.850 25.49% 35.942 43.94%
April 18.220 22.27% 19.980 24.43% 34.301 41.93%
May 20.436 24.98% 27.750 33.92% 65.578 80.17%
June 24.229 29.62% 30.730 37.57% 38.362 46.90%
July 26.023 31.81% 30.940 37.82% 53.832 65.81%
August 25.244 30.86% 33.410 40.84% 53.136 64.96%
September 23.696 28.97% 28.980 35.43% 61.258 74.89%
October 22.796 35.07% 26.805 41.24% 51.674 79.50%
November 23.135 35.59% 29.685 45.67% 47.088 72.44%
December 23.592 36.30% 25.457 39.16% 47.000 72.31%