Oct. 2, 2018
Closure

Chemical sanitizer is too low and microorganisms may survive in the pool which can cause infection and disease to bathers.

Inspection Results - Posted for one year

Oct. 2, 2018
Routine Inspection

Not in Compliance
pH is maintained at a range of 7.2-7.8
Not in Compliance
Free available chlorine or total bromine is maintained at a range of 5-10 ppm
Not in Compliance
Spa hydro-massage jet fittings are equipped with a timing device that controls the period of operation of the jet pump and can be set to a maximum of 15 minutes.

Oct. 2, 2018
Re-inspection

No Issues Found
No infractions were found at the time of inspection

Sept. 8, 2018
Routine Inspection

No Issues Found
No infractions were found at the time of inspection

Aug. 16, 2018
Routine Inspection

Not in Compliance
Spa has a designated operator who is trained in spa operation.
Not in Compliance
Spa is rendered inaccessible to persons who are not involved with its operation, inspection or maintenance, except during the daily use period.

June 15, 2018
Routine Inspection

Corrected During Inspection
Water facility inaccessible when closed
Not in Compliance
ORP Reading great than 700mV; if operated with an Automatic Sensing Device.
Not in Compliance
Manual tests and records completed
Not in Compliance
Stop button - Outlet covers, emergency stop button and vacuum release mechanism tested and recorded every 30 days.

April 30, 2018
Follow-up Inspection

No Issues Found
No infractions were found at the time of inspection

April 23, 2018
Routine Inspection

Not in Compliance
Clock is available and placed in a conspicuous location
Not in Compliance
Free Available Chlorine (FAC)/ Total Bromine (5mg/L - 10mg/L)
Not in Compliance
The total alkalinity is 80 milligrams per litre or greater.
Not in Compliance
Manual tests and records completed

Feb. 6, 2018
Routine Inspection

Corrected During Inspection
pH (7.2 – 7.8)
Not in Compliance
ORP Reading great than 700mV; if operated with an Automatic Sensing Device.
Not in Compliance
Manual tests and records completed
Not in Compliance
Stop button - Outlet covers, emergency stop button and vacuum release mechanism tested and recorded every 30 days.

Dec. 12, 2017
Routine Inspection

Corrected During Inspection
pH Levels not within specified range
Not in Compliance
ORP Reading great than 700mV; if operated with an Automatic Sensing Device.
Not in Compliance
Manual tests and records not completed

Page Feedback Did you find what you were looking for today?